This system is designed to learn the skills to prepare and install pipes and hoses found in industrial installations that are essential to safely carry liquids and gases.
The main learning objectives are the reading of piping schematics, calculation of pipe lengths, fabrication, installation, and testing of piping circuits made of galvanized steel pipes, hoses, PVC pipes, and copper tubes. The system can also be used to teach students how to enforce the safety rules to be followed when working at industrial sites.
The workstation can accommodate two teams of students when the second team add-on is selected.